b'LT ENGINEERINGCATALOGMAINTENANCE SIZINGThe Neutralization Tank should be inspected periodically.It is common practice to size the LabTank based on Upon inspection, foreign debris should be removed andlaboratory stations or sinks. In general laboratory Chemical Rock added if needed. To summarize, the mainapplications like schools or hospitals, 10 gph per stationsteps to follow at maintenance time are cited below. of effluent discharge is used. See the chart below.For more detailed information refer to the Operationsand Maintenance Manual. Verify pH in the effluent, if below standards, labrox needsto be replaced as first mitigation measure. Stop flow passing through the unit. Remove all debris and trash present inside. Remove old/inert labrox from inside the tank. Apply new rock media into the tank. Open the flow for operation. Verify pH at the effluent again, waiting 30 minutes before taking the first measure to allow for system chemical equilibrium.Acid Neutralization Tank Model ANT SizesLABTANKNEUTRALIZATIONNEUTRALIZATIONMAXIMUMNUMBER OF LAB MODEL FILL IN LBS FILL IN CU. FT GALLONS EFFLUENT GAL/ STATIONSHRANT-50 700 7 50 100 10ANT-100 1,300 13 100 200 20ANT-150 2,000 20 150 300 30ANT-200 2,700 27 200 400 40ANT-250 3,300 33 250 500 50ANT-350 4,700 47 350 700 70ANT-500 6,700 67 500 1,000 100ANT-700 10,000 94 700 1,400 140ANT-800 10,700 107 800 1,600 160ANT-1000 13,400 134 1,000 2,000 200ANT-1500 20,200 201 1,500 3,000 300ANT-2000 26,700 267 2,000 4,000 400ANT-2500 33,400 334 2,500 5,000 500372 INFO@PARKUSA.COM|888-611-7275|WWW.PARKUSA.COM'