b'LT ENGINEERINGCATALOGDESIGN CONSIDERATIONS SIZINGMeter vaults are constructed of quality precast concrete,When specifying a meter assembly for an application, the Class I 4500 PSI @ 28 days. Pre-casting the concreteengineer should identify if the unit is to be used to meter enclosure insures that all units achieve structural andwater service for domestic water, fire service, combination,physical uniformity. The units are structurally engineeredor irrigation. Then, the piping size must be verified on the for H-20 traffic loading if specified and can be buriedcorresponding plans. Current Water Meter Assemblies sizes without any need for any other structural protection. are on following page.MAINTENANCEWater Meter Assemblies must be inspected annually with the results recorded on inspection report to be submitted to the local AHJ. If any essential part of the unit fails inspection, it must be repaired or replaced then passa subsequent inspection.SYSTEM COMPONENTSThe ParkUSA Water Meter Assembly presents the following components:AMR TransmitterAccess Hatchway with Safety NetWater SVCVault Lidfrom City MainNRS Gate ValvesWater SVC to BuildingGalvanized Steel Pipe SupportCompound or Turbine Water Meter10 INFO@PARKUSA.COM|888-611-7275|WWW.PARKUSA.COM'